View Issue Details

IDProjectCategoryView StatusLast Update
0001225K18X001.00 SKB SWANHWpublic2022-08-16 19:26
Reporter(ALTech) SH Son Assigned To(HW) Sean Chiang Due Date
PrioritynormalSeveritys4-minorReproducibilityhave not tried
Status closedResolutionfixed 
Summary0001225: [SWAN] DVT2 assembly review
DescriptionDVT2 assembly review from ALT

please make improvement plan in DVT3
TagsNo tags attached.
Attach Tags

Activities

(ALTech) SH Son

2021-05-11 11:20

developer  

(HW) Sean Chiang

2021-05-19 20:21

developer  

(HW) Sean Chiang

2021-05-19 20:21

developer   ~0007174

Hi SH,

Please find attached for the 8D report of DVT2 assembly of missing part and label NG issue.
For the label issue, we didn't place the D6 in the report since the root cause has not been confirmed yet.
In NPI stage, our factory will do 100% visual check. So, our PQE engineer think that the NG label may be caused after shippment.
We will contunue to tracking this issue and do the ORT test at DVT3 stage to see if the label is no problem or not.
Please check the report and let us know if you have any further questions. Thanks.

Regards,
Sean

(ALTech) SH Son

2021-05-27 17:00

developer   ~0007278

HI Sean
When do you update the other NG report?
• PCB/FFC contamination



Thanks
SON

(HW) Sean Chiang

2021-05-28 13:36

developer   ~0007291

Hi SH,

The FFC/PCB contamination issue is own by factory ME engineer.
Since the ME engineer is located in Guang Chau factory now, they can only response it after the factory re-open.
I will udpate the schedule to you when the Guang Chau factory reopen.

Thanks,
Regards,
Sean

(HW) Sean Chiang

2022-08-16 19:24

developer   ~0010636

Hi SH,

We are reviewing the open issues in mantis system internally.
I believe this issue should have been resolved. So, I will close this mantis issue first, and we can reopen it if necessary.

Thanks,
Sean

Issue History

Date Modified Username Field Change
2021-05-11 11:20 (ALTech) SH Son New Issue
2021-05-11 11:20 (ALTech) SH Son File Added: Swan_soundbar_DVT2_assenbly review_202100511.pdf
2021-05-11 11:20 (ALTech) SH Son Issue Monitored: (ALTech) Lonnie Kim
2021-05-11 11:20 (ALTech) SH Son Issue Monitored: (ALTech) SH Son
2021-05-11 11:20 (ALTech) SH Son Issue Monitored: (ALTech) Sophie Lee
2021-05-11 11:20 (ALTech) SH Son Issue Monitored: (ALTech) SY Yoon
2021-05-11 11:20 (ALTech) SH Son Issue Monitored: (HW) Sean Chiang
2021-05-11 11:20 (ALTech) SH Son Issue Monitored: (PM) Dennis Lu
2021-05-11 11:20 (ALTech) SH Son Issue Monitored: (PM) Tiffanie Lai
2021-05-11 11:20 (ALTech) SH Son Issue Monitored: (RD) Jim Chen
2021-05-11 11:21 (ALTech) SH Son Issue Monitored: (ALTech) Philip
2021-05-11 11:21 (ALTech) SH Son Assigned To => (HW) Sean Chiang
2021-05-11 11:21 (ALTech) SH Son Status new => assigned
2021-05-11 12:22 (HW) Sean Chiang Issue Monitored: (HW) Tom Lee
2021-05-19 20:21 (HW) Sean Chiang File Added: BFX-UA300 Missing Part inside product 8D report.pdf
2021-05-19 20:21 (HW) Sean Chiang File Added: BFX-UA300 Label Attachment NG 8D report.pdf
2021-05-19 20:21 (HW) Sean Chiang Note Added: 0007174
2021-05-27 17:00 (ALTech) SH Son Note Added: 0007278
2021-05-28 13:36 (HW) Sean Chiang Note Added: 0007291
2021-12-24 17:46 (HW) Sean Chiang Severity s2-severe => s4-minor
2022-08-16 19:24 (HW) Sean Chiang Note Added: 0010636
2022-08-16 19:26 (HW) Sean Chiang Status assigned => closed
2022-08-16 19:26 (HW) Sean Chiang Resolution open => fixed